Tonnage
rates of discharge:
200/300 tonnes per hour
Tonnage load rate:
150/300 tonnes per hour
Quayside storage facilities:
3100 sq m of warehousing
|
|
 |
Berwick-upon-Tweed
Harbour Commission are the Competent Harbour Authoirty
who operate the port, which handles all shipping up to
the limitations within the safe tidal Tweed Dock.
|
Dock
Maximums |
| Length |
116m |
| Beam |
16.5m |
| Draft |
4.6
(Spring tides) |
|
3.8
(Neap tides) |
|
|
There
is also an additional jetty adjacent to the Tweed
Dock, with a facility to load stone cargoes.
|
|