Text Size
Notice is hereby given that repair operations have commenced at Berwick Breakwater and will continue over the coming weeks. Divers may be working in the vicinity. Mariners are requested to navigate with caution, give as wide a berth as possible and keep speed to a minimum at all times.
D.Wood (Harbour Master) - 20th July 2011
| Latitude | 55° 46' N | Harbor Size | Small |
| Longitude | 2° 00' W | Harbor Type | River Tide Gate |
| First port of entry | Yes | Shelter | Good |
| ETA Message Required | Yes | Turning Area | |
| Max. Vessel Size | < 150 m | Medical Facilities | Yes |
| Tide | Yes | Swell | No |
| Ice | No | Other | Yes |
| Overhead Limit |
| Channel | 6 - 10 feet 1.8 - 3.0 meters |
Anchorage | 41 - 45 feet 12.5 - 13.7 meters |
| Cargo Pier | 16 - 20 feet 4.9 - 6.1 meters |
Oil Terminal | 0 - 4 feet 0.0 - 1.2 meters |
| Mean Tide | 4 | ||
| Compulsory | Yes | Advisable | Yes |
| Available | Yes | Local Assist |
| Assist | Yes | Salvage |
| Pratique | Yes | Deratt Cert | Yes |
| Other |
| Telephone | Yes | Telegraph | |
| Radio | Yes | Radio Tel | |
| Air | Rail | Yes |
| Wharves | Anchor | ||
| Med Moor | Beach Moor | ||
| Ice Moor |
| 100+ Ton Lifts | Fixed Cranes | ||
| 50-100 Ton Lifts | Mobile Cranes | Yes | |
| 25-49 Ton Lifts | Floating Cranes | ||
| 0-24 Ton Lifts | Yes |
| Longshore | Yes | Electrical | Yes |
| Electrical Repair | Yes | Navigation Equipment | Yes |
| Steam |
| Provisions | Yes | Water | Yes |
| Fuel Oil | Yes | Diesel Oil | Yes |
| Deck | Yes | Engine | Yes |
| Ship Repairs | Moderate | Drydock Size | Unknown |
| Marice Railroad Size | Garbage Disposal | Yes | |
| Degauss | Dirty Ballast | No |